Entrusted by the transferor (the Sellers), we
have scheduled to hold an online public bidding on www.affordablecheapautoinsurance.com from 16:00
to 16:30 (Beijing Time) on May 31st, 2022.
1. Bidding Object:
MV“HAI FENG 648”, Refrigerated Carrier; IMO:
8710132; Flag State: Panama; Class: CCS; LOA: 124.70m; MLB: 17.80m; MLD: 9.85m;
Summer DWT: 6538t on 7.317m draft; Light Ship: 3230t; GRT:4939; NRT:3026; M/E:
MITSUBISHI 6UEC45LA, 5150kW@158rpm; Generators: YANMAR M200L—ST*3 sets,
660PS@720rpm; Built Time: February 7th, 1988; Builder: Hakodate Dock Co., Ltd.,
Japan (Data above refers to the ship inspection certificates)
Remarks: The ship is on voyage.
2. Bidding Rules:
It has no reserved price. If there is only one
bidder participating in the bidding, the potential transfer of the Ship will be
confirmed automatically after the bidding period. If there are two or more
bidders participating in the bidding, the potential transfer of the Ship will
be carried out by auction.
The starting price is USD 1.559 million, and the
bidding deposit is USD 0.15 million (or RMB 1 million). Bid Increment: a
multiple of USD 0.02 million.
If the Buyers pay the deposit in US dollars when
applying for the bidding, it will be automatically converted as part of
purchase fund after the bidding. If the Buyers pay the deposit in CNY, Buyers
shall pay another USD 0.15 million separately to the bidding company’s
designated US dollar account within 2 banking days upon the completion of the
bidding. The bidding company shall return the CNY deposit fully back to the
Buyers within 1 banking day after the receipt of the US deposit.
3. Registration:
Registration is available from the date of this
Announcement and ends on May 31st, 2022(Beijing Time) before the bidding starts
(subject to the receipt of bidding deposit, the completion of online
registration and the receipt of the bid number obtained on the platform. It is
recommended to pay deposit 1-2 days in advance in order to avoid any problems).
No application will be accepted after the deadline. The time of this bidding
activity shall be subject to Beijing time. This bidding only accepts the application
of legal entity or organizations incorporated.
4. Date and Place for Inspection of the Object:
The potential bidders are invited to inspect the
bidding object at Shidao Port in Shandong with the time is to be determined (we
will issue the notice in advance if possible). Please contact with the bidding
company for details. Potential bidders shall inspect the Ship within the
stipulated time. The risk and expenses in relation to the inspection shall be
borne by the potential bidders. The Sellers shall only be responsible for
coordination work. Potential bidders who fail to participate in the on-site
inspection yet complete the registration procedure within the prescribed
inspection time shall be deemed to have recognized and accepted the status quo
and defects of the Ship.
5. Account of Bidding Company:
(1) USD Acct:
l Bank: Bank of Hangzhou Co., Ltd
l Bank Add: No.46 Qingchun Road, Hangzhou, China
l SWFIT Code: HZCBCN2H
l Acct: 3309040160000372942
l Beneficiary: Zhoushan Yi Ge Ship Auction Co., Ltd.
l Beneficiary add.: No.555 Wengshan Road, Lincheng Street,
Dinghai District, Zhoushan City, Zhejiang Province, China
l Remittance Reference: HAI FENG 648
(2) CNY Acct:
l Beneficiary: 舟山易舸船舶拍賣有限公司
l Account No.: 1206020119200768341
l Beneficiary Bank: 工商銀行舟山分行營業部
6. Contacts:
Mr Gao: +86 18058087033 / +86-580-2038333;
Ms Ye: +86-580-2027516;
E-mail: auction@shipbid.net
Zhejiang Shipping Exchange Market Co., Ltd.
Zhoushan Yi Ge Ship Auction Co., Ltd.
May 16th, 2022
Article 1 Bidding Rules is made by relevant laws, regulations
and policies of our Country and with Shipbid practical situations, to
standardize the bidding behaviors, maintain an open, fair and equal transaction
order, and protect legitimate rights and interests for all the parties
involved.
Article
2 The Transaction Rules of the ship bidding (hereafter to be referred as
bidding) is suitable for standardizing all the online bidding behaviors. All
the parties involved should abide by the Rules and bear legal responsibilities
for their own behaviors.
Article
3 All legal personalities, natural persons and other organizations in and
abroad PRC can participate in the bidding only if they have the qualifications
of the auction announcement except those provided by laws and regulations.
Article
4 The auction announcement and other documents are formulated by the auctioneer.
Article
5 The auction information including videos, pictures and written introductions
offered by the Seller will be uploaded through the Shipbid system after
verified by the auctioneer.
Article
6 The Seller shall take all the legal responsibilities and economic losses if
he provides with fake information.
Article
7 The bidders couldn’t participate in the bidding activities until they
register as the buyers through the Shipbid system.
The
passwords should be kept safely. If forgotten, bidders could retrieve through
the Shipbid system. And if divulged, bidders should login in time to change the
passwords.
Article
8 Before submitting the application for the bidding, the bidders should
carefully read the auction announcement, ship’s information, transaction rules
and other relevant documents, then login the Shipbid system to fill in true and
effective information as required.
Article
9 The bidders should submit the applications in accordance with the auction
announcement before the Shipbid starts.
If legal personalities, natural persons and
other organizations need joint-bidding, they should fill in related information
and the proportion of capital contribution of each party as required and sign
the Joint Bidding Statement.
Article
10 The bidders apply on the Shipbid system by themselves, and pay the deposit
either on line or offline. One deposit is only for one lot. And if the bidders
want to bid several ships at the same time, corresponding deposits are
required.
The
bidders are entitled to bid only if the deposit fully paid to the nominated
account (based on the arrival time of the deposit )within the required time.
The bidders shall not be eligible for bidding if the deposit is delayed or not
fully paid on time.
Article
11 The bidding shall be conducted with time limit. Qualified bidders can
participate in the bidding. The initial offer shall not be lower than the
starting price and each offer shall be no less than the specified bid
increment.
If
it is an auction with reserve price, “YES” will be revealed in the system.
Otherwise it will display “NULL”.
Article
12 The bidder shall make a cautious bid, and the offer will be irrevocable once
submitted.
Article
13 The last limited time of the Shipbid is FIVE (5) minutes. If there is a new
bid within 5 minutes countdown, another 5 minutes will be set.
No
new offers would be accepted after the final countdown, and the bidding history
will be revealed.
Article
14 Once there is/are (a) bidder offer(s) in the Shipbid, the target bidder
(hereinafter called the Buyer) shall be confirmed in accordance with the
following rules
(1)
Where there is no reserve price, the highest bidder would be the Buyer.
(2)Where
there is a reserve price, the bidder with the highest offer and not lower than
the reserve price would be the Buyer; If the highest offer is lower than the
reserve price, the bidding will be pass.
When
the time for the bidding is over, the bidding system will be automatically
closed.
Article
15 The Buyer should confirm his qualification with the enterprise or
individual valid certification to the auctioneer within 2 working days after
the bidding. After verification and confirmation, the Buyer should sign the
Purchase Confirmation.
If
the bidding becomes invalid or the final transaction fails because of the
Buyers who provides the false registration documents, unilaterally violates the
contract or regrets the bids, the bidding deposit remitted by the Buyers shall
be the property of the Sellers. The Buyers shall pay the bidding commissions
both for themselves and the Sellers(if any), and should make up the price
difference if the final Purchase Price(via auction again) is lower than the
first amount.
Article
16 The payment of balance shall be remitted to the nominated account in time
according to the Purchase Confirmation.
Article
17 The Buyer should sign the Sale and Purchase Agreement by the Purchase
Confirmation with the seller within the required time and make relevant
transaction procedures.
Article
18 The auctioneer should publicize the bidding results through the Shipbid
system after the bidding.
Article
19 After paying the balance, the Buyer himself should handover the lot and
manage the transaction procedures in time. If the Buyer fails to manage within
required time, he himself should pay the costs caused by the delay and afford
the consequences of possible damage or losses.
Article
20 The Buyer himself should register the lot and bear all relevant expenses
occurred according to the regulations and policies during the transaction
procedures.
Article
21 The bidding currency is US dollar. Both the starting price and purchase
price do not include the expenses and taxes occurred during transaction
procedures.
Article
22 If the bidder obstruct others to bid, manipulate or monopoly the bidding
price, or make malicious collusion, the auction will be cancelled once above
behaviors are found, and relevant legal responsibility will be borne by the
bidder.
Article
23 If the bidder cannot normally login the Shipbid system to apply, offer or
bid because of following reasons such as virus invasion, hardware failure,
network congestion or passwords forgotten and divulge, etc., he himself should
bear the consequences and the bidding will not be suspended.
Article
24 The auctioneer reserves the right to suspend or withdraw the bidding before
it starts according to the laws and regulations.
Article
25 The auctioneer reserves the right to suspend or withdraw the bidding if
force majeure or accident has caused the online auction to fail.
Article
26 These rules are general rules for online auction transactions of ships. In
case of any conflict with the announcement or agreement of a single item, the
terms of a single item shall prevail.
Article27 Bidding announcement, additional
provision and other contents are described both in
Chinese and English. In case of any discrepancy between the two languages,
Chinese shall prevail.
The
time concerned in the bidding all depends on Shipbid system service time,
except the deposit arriving time which depending on the bank recording time.
All the time of information arriving is subject to the time when the
information received by Shipbid.
Zhejiang
Shipping Exchange Market Co Ltd is responsible for the interpretation of the Rules.
1. This additional provision is a supplement to
the bidding rules and has the same legal effect as the bidding rules.
2. Bidding Object:
MV“HAI FENG 648”, Refrigerated Carrier; IMO:
8710132; Flag State: Panama; Class: CCS; LOA: 124.70m; MLB: 17.80m; MLD: 9.85m;
Summer DWT: 6538t on 7.317m draft; Light Ship: 3230t; GRT:4939; NRT:3026; M/E:
MITSUBISHI 6UEC45LA, 5150kW@158rpm; Generators: YANMAR M200L—ST*3 sets,
660PS@720rpm; Built Time: February 7th, 1988; Builder: Hakodate Dock Co., Ltd.,
Japan (Data above refers to the ship inspection certificates)
Remarks: The ship is on voyage.
All the information and data provided in the
Bidding Announcement, Special Provision, Technical Report as well as any other
channel related to the Ship are for reference only. The bidding object is
subject to the status at the time of inspection. If there is any discrepancy
between the actual situation and the data above, the bidding and bidding price
won’t be disturbed. Once the bidding is concluded, the bidding company and the
Sellers shall not assume any liability for defects or quality problems of the
bidding ship.
3. After Bidding:
3.1 Following a successful bidding, the Buyers shall
send an Auction Confirmation to the Bidding Company on the same day (the
“Bidding Day”) at the email address or facsimile number. The Buyers shall
courier six of original Auction Confirmation to the Bidding Company within two
(2) Banking Days after the Bidding Day.
3.2 The Buyers shall sign the MOA with sellers
within nine (9) banking days after bidding.
3.3 The bidding deposits of the unsuccessful
bidders shall be returned within two (2) banking days after the bidding without
interests.
3.4 It’s acknowledged the dollar account
designated by the bidding company is the escrow account for the Buyers and
Sellers to hold and release the funds of the Purchase Price. The bidding
company shall release the purchase price, ROB charge and other payables to the
sellers within three (3) banking days after receiving the PODA and release
instruction signed by both parties. The bidding company shall not charge any
additional fee for the escrow service of funds, and all funds logging into the
escrow account have no interest. If other Third Party proposed by the Buyers
and agreed by the Sellers as the Escrow Agent, all relevant costs will be borne
by the Buyers.
4. Transfer (Deletion) and Delivery of the Ship:
4.1 The Buyers shall pay all the bidding service
fee not later than 16:00 June 2nd, 2022 (Beijing Time), and remit the balance
of the purchase price, estimated ROB charge and other payables (if any) to the
escrow account two (2) banking days prior to the Vessel’s expected delivery
date. Any delay or failure to pay fees mentioned above shall be deemed as a
breach of the Bidding Announcement and the MOA.
4.2 The original ship owner (as the Sellers)
should complete all the deletion procedures relating to the ship within 20
banking days after signing PODA.
The latest delivery date: June 30th, 2022.
4.3 Delivery Place: The ship shall be delivered
and taken on an “as is where is” basis at the time of inspection, and the
Buyers take delivery at one safe port or anchorage of Shidao Port, China. The
Sellers are not responsible for any time and cost for Buyers to take delivery
of the Ship which shall be for the Buyers’ account.
4.4 If the delivery and acceptance of the bidding
object is executed in time s of unprecedented business interruptions and travel
limitation at Shidao Port due to Novel Coronavirus Pneumonia prevention and
control policy restrictions or other force majeure factors, the parties
declared intention and understanding to work closely together to perform fully
under this Announcement and MOA and complete this transaction, finding an
alternative place of delivery (domestic coastal ports) and / or time of
delivery, all the expenses (including but not limited to fuel consumption,
labor costs, etc.) incur during the ship sailing from Shidao to the new delivery
port should be borne by the Buyers, and any time delayed shall not be deemed as
a breach of contract of the Sellers.
4.5 The sales and purchases contract will be
revised and signed basis on SALEFORM 2012 made by Norwegian Shipbrokers’
Association as attached. If there is any conflict or ambiguity with the
contents of this Announcement, the contents of this Announcement shall prevail.
5. Related expenses:
5.1 Bidding service fee: After the bidding, the
Buyers shall pay the bidding company 1% of the purchase price as bidding
service fee (settled in USD).
5.2 The bank charges related to the bidding
deposit shall be borne by the bidders; and the bank charges related to the
purchase price shall be borne by the Buyers.
5.3 The Sellers would provide with commercial
invoice of the purchase price. All the taxes, expenses and costs incurred after
the ship delivery shall be borne by the Buyers themselves.
5.4 On delivery, the Buyers and the Sellers shall
take measurement of the remaining bunkers and unused lubricating oils. The
Buyers shall take over remaining bunkers and unused lubricating and hydraulic
oils and grease in storage tanks and unopened drums and pay with the actual net
price (exclude barging expenses) as evidenced by invoices or vouchers; or if
the invoices or vouchers are not available, the Platts Singapore price on the
4th business days prior to the date of delivery to be applied.
5.5 Any taxes, fees and expense in connection
with the purchase and registration in the Buyers' Nominated Flag State shall be
for the Buyers' account, whereas similar charges in connection with the closing
of the Sellers’ register shall be for the Sellers' account.
The Ship with everything belonging to her shall
be at the Sellers' risk and expense until she is delivered to the Buyers, while
the Ship’s risk and expenses shall be for the Buyers’ account after the
delivery of the vessel under this Agreement.
6. Matters not covered herein shall be settled
through negotiation by the bidding company, the Sellers and the Buyers.
7. This announcement is described in both Chinese
and English. If any discrepancy occurs between the two languages, the Chinese
version shall prevail.
Zhejiang Shipping Exchange Market Co., Ltd.
Zhoushan Yi Ge Ship Auction Co., Ltd.
May 16th, 2022